Use casesMoney and contracts

Stop paying for a backup link that shouldn’t be carrying traffic.

The most expensive WAN problems have no symptoms. Service quality is fine, so nobody looks. A metered backup stuck in service, or a circuit running at ten percent, shows up only on the invoice.

  • Timeabout 15 minutes
  • ForFinance and vendor management, Network lead
  • ScreensExplorer, Remediation, KPI Studio, SLOs, Boards

Recognize it

You’re here if

  • A metered 4G or 5G link has overage charges and the primary is healthy.
  • A premium circuit has been under 15% utilization for weeks.
  • Cost review is next month and nobody knows where the spend went.

Do this

5 steps, in order

  1. Find a healthy primary with a busy metered backup

    Pick a site. Compare the primary’s Utilization with the backup’s over the widest window.

    Open Explorer
    Look for
    The primary near idle and available, the metered backup carrying the traffic.
    What it means
    That is a stuck failover. Service is fine and the meter is running.
  2. Clear the hold-down

    Review the recommendation to reset the preferred-path policy so the site returns to the primary.

    Open Remediation
    Look for
    A reversible action, gated for approval.
    What it means
    Confirm afterwards that the backup falls idle and overage stops.
  3. Add a detector so it can’t recur silently

    In KPI Studio, define a link KPI scoped to the 4G and 5G link types: sustained average utilization. Test it on history, then operationalize it.

    Open KPI Studio
    Look for
    A backtest showing when it would have fired on the stuck-failover weeks.
    What it means
    A metered link that carries traffic for days should tell you, rather than the invoice.
  4. Find idle capacity

    Look for primaries running at low utilization while meeting their targets.

    Open SLOs
    Look for
    Circuits at 8 to 15% utilization at peak.
    What it means
    Right-size the committed rate, or move baseline traffic to a cheaper path and keep the premium circuit for latency-sensitive flows.
  5. Bank the number

    Add the projected monthly saving to a board so it is visible at the cost review.

    Open Boards
    Look for
    A saving someone owns.
    What it means
    An unowned saving is not a saving.

Then decide

What you found decides what you do

  • IfBackup is metered, primary is healthy and idle

    ThenStuck on backup. Reset failback and add the detector. RB-COST-STUCK-BACKUP

  • IfPrimary is consistently under about 15% at peak

    ThenRight-size or re-route baseline traffic. RB-COST-UNDERUTIL

  • IfOverage coincides with a bulk transfer on a metered link

    ThenMove the transfer to the primary or schedule it off-peak. Voice dies at the same hour daily →

Watch out

Where this goes wrong

  • Do not right-size on one quiet month. Look at the widest window and at seasonality before you cut capacity.
You’re done when

The stuck backup is cleared, a detector exists, and the idle capacity has an owner and a number.