Prove the carrier broke its SLA, and claim the credit.
Carriers pay credits to customers who bring dated evidence, and nobody else. NetPulse already holds the availability series and the failover events. The work is assembling them into something a carrier’s billing team cannot argue with.
Recognize it
You’re here if
- A circuit was unreliable all month and nobody added up the downtime.
- A renewal is 90 days away and you have no numbers.
- You are asked how a provider has really performed.
Do this
5 steps, in order
Find the breaches
Open SLOs and sort for BREACH. Read target against actual availability and the error budget used.
Open SLOs- Look for
- Links whose actual availability is below target, with a budget of 100% or more used.
- What it means
- These are your claim candidates. Note the provider for each.
Pull the dated evidence
For each candidate, open Availability on the month. Count the intervals down and note when they occurred.
Open Explorer- Look for
- A list of outage intervals with timestamps.
- What it means
- Your claim needs dates and durations, not a percentage.
Add the failover events
Open the incidents for the link. Use their evidence block and the failover rows as the carrier-facing record.
Open Governed Brain- Look for
- Failover and SLA-violation rows tied to the same link.
- What it means
- Two independent records of the same outage are far harder to dispute.
File with the evidence attached
Send the claim to the carrier’s billing contact with the SLO table, the interval list and the failover rows.
- What it means
- Quote the billing month and the circuit identifier in the first line.
Build the provider scorecard
Make a board comparing the provider’s p95 latency, rolling availability and failover rate against its peers.
Open Boards- Look for
- A comparison across providers on the same axes.
- What it means
- Take it into the renewal conversation 90 days out, not 9.
Then decide
What you found decides what you do
IfOne circuit is below its floor
ThenFile a credit claim and request a permanent repair. A circuit keeps flapping →
IfA provider is in the bottom quartile across several circuits
ThenOpen a renegotiation, and evaluate alternatives before the renewal date.
Watch out
Where this goes wrong
- Check which window your contract measures, such as a calendar month or a rolling 30 days, and match it. NetPulse’s SLO window may differ.
You have a claim with dated evidence filed, and a scorecard ready for the renewal.
Keep going
Often next
A circuit keeps flapping
Stop the path-change storm, then turn a month of micro-outages into a repair and a credit.
~15 minNOC engineer, Network lead, Finance and vendor managementMoney and contractsFind the WAN money leaks
Catch stuck-on-backup and idle circuits, and bank the savings with a detector that keeps watching.
~15 minFinance and vendor management, Network leadRun the NOCBuild your NOC wall
Choose the questions the wall answers, build a board for them, and put it on a screen.
~25 minNOC engineer, Service owner, Network lead